Municipal High Level Reservoir (Lucky Lane Reservoir)

Large green cylindrical water tank behind a security fence, bearing a partial “...alie” label and a Business Oregon sign
Project Location
Estacada, OR
Client City of Estacada
Market Sector
Project Type
  • General Utilities & Infrastructure

Project Highlights

  • Constructed a new 500,000-gallon water storage reservoir.
  • Expanded water storage capacity to support future community growth.
  • Improved the reliability and performance of the City’s water distribution system.

Project Description

The High Level Reservoir project expanded the City of Estacada’s water storage and distribution system to improve long-term reliability, increase capacity, and support future community growth. The project included the construction of a 500,000-gallon epoxy-coated, bolted steel water storage reservoir, along with approximately 1,800 feet of transmission pipeline and 1,800 feet of 8-inch drain line to support the overall system.

The improvements were designed to strengthen the City’s water infrastructure and enhance the efficiency and performance of its distribution network. By increasing available storage capacity and improving the transmission of water throughout the system, the completed project provides a more reliable and resilient water supply to meet both current needs and future demand.

Work performed by Curran-McLeod, now part of MacKay.